Burnco – Batch Chiller Project

Project Location:
Burnaby, BC

For this project, our client needed help to fix a chiller system that was short cycling. Our solution was to fabricate a large headtank that would be installed to the existing piping system to increase the volume of water being circulated. In turn, this allowed the system to run more efficiently which resulted in energy and cost savings. We were happy to help with this job and look forward to working with them in the future.