Close Search

Rocky Point Pool – UV Disinfection System Upgrades

Over the last 2 months, Absolute has been working hard with the City of Port Moody to get the Rocky Point Outdoor Pool up and running for the 2019 Summer Season. It was such a pleasure working with City of Port Moody on this one. Even though we saw numerous challenges with the schedule, everyone was able to rally together to make this come together in a short amount of time. Huge thank you to our sub-contractors on this one – Duron Restoration Ltd., Form-All Construction Ltd., Magnum Creek Cooling and Wolf Electric Ltd. – we couldn’t have done it without you!